Movies 278

 

Movies 278

Movies 278 was the prototype 14 screen facility for MnM theaters. The structure is a 42,000 sf, single story theater with a 4,800 sf sound and projection mezzanine. Construction consists of a structural steel frame, precast wall panels with applied aluminum panels and neon lighting, and an EPDM roof system. Interior construction included a conventional film projection system, stadium seating, and a concession area. This project included the DOT turning lanes, parking lot and an extensive sitework, utilities and landscaping package for the eleven acre development.

Location: Atlanta, GA

Project Duration: 10 months, completed October 1, 2004

Contract Value: $5,390,000

Owner: MnM Theaters Entertainment

Architect: Gary S. Flesher Architect

Copyright Pinnacle Services Group, Inc. All rights reserved.

Walther Professional Center

 

Walther Professional Center

This is a privately owned 20,000 sf multi- tenant medical office building with a structural steel frame, split face and glazed block skin, cantilevered curtain wall elements, and a TPO roof system. The project interior features numerous architectural elements consisting of glass block walls, preformed plaster wall panels, wood wall coverings, decorative blown glass light fixtures, and a 500 gallon fish tank. Also included were the sitework, utilities, landscaping, parking lot and a one acre build to suit building pad.

Location: Lawrenceville, GA

Project Duration: 9 months, completed September 12, 2008

Contract Value: $3,530,000

Owner: ENTOB Group LLC

Architect: Colin Lichtenstein & Associates

Copyright Pinnacle Services Group, Inc. All rights reserved.

Movies ATL

 

Movies ATL

Movies ATL is MnM Theater’s newest 14 screen facility in the Atlanta market. The structure is a 42,000 sf, single story theater with a 4,800 sf sound and projection mezzanine. Construction consists of a structural steel frame, precast wall panels with applied aluminum panels and neon lighting, and a TPO roof system. Interior construction included a state-of-the art digital projection system, stadium seating, and a concession area. This project included the parking lot and an extensive sitework, utilities and landscaping package for the nine acre development. Numerous interior renovations have been completed for this client at the other theater locations.

Location: Atlanta, GA

Project Duration: 10 months, completed October 25, 2007

Contract Value: $7,260,000

Owner: MnM Theaters Entertainment

Architect: Gary S. Flesher Architect

Copyright Pinnacle Services Group, Inc. All rights reserved.

UPS Roswell Terminal Truck Parking

 

UPS Roswell Terminal Truck Parking

Asphalt pavement Employee Parking Lot expansion and concrete/asphalt pavement Terminal Truck Parking Lot all-inclusive of storm water improvements, site lighting, fencing and landscaping

Location: Roswell, GA

Project Duration: 5 months, completed 2/25/2016

Contract Value: $2,190,000

Owner: United Parcel Service

Engineer: Prime Engineering, Inc.

Copyright Pinnacle Services Group, Inc. All rights reserved.

UPS Pleasantdale Remote Staging

 

UPS Pleasantdale Remote Staging

An 8.4 acre site development and construction of a trailer staging lot including storm water structures, detention ponds, heavy duty asphalt and concrete paving, site utilities, pre-engineered building structure, site lighting, fencing and landscaping.

Location: Doraville, GA

Project Duration: 4 months, completed 12/12/2016

Contract Value: $3,203,000

Owner: United Parcel Service

Engineer: Prime Engineering, Inc.

Copyright Pinnacle Services Group, Inc. All rights reserved.

UPS Forest Park Hub Expansion

 

UPS Forest Park Hub Expansion

This was an 8 acre site development and expansion of an existing UPS distribution facility to add additional trailer storage and two building expansion points. Site development included storm water structures, retention and detention pond elements, heavy duty asphalt and concrete paving, site lighting and landscaping. Site development included full dam reconstruction to meet Georgia Safe Dams requirements.

Location: Forest Park, GA

Project Duration: 4 months, completed 12/12/2016

Contract Value: $3,360,000

Owner: United Parcel Service

Engineer: Prime Engineering, Inc.

Copyright Pinnacle Services Group, Inc. All rights reserved.